31,000 USD
2021 BMW M3 VIN WBS33AY08MFL24209
- Auction
- iaai
- Date
- VIN
- WBS33AY08MFL24209
- LOT
- 33086445
Sold for $29,450 at IAAI on July 2, 2023, about 9% above the model-year average of $26,951
This sold 9% above the model-year average across 232 archived sales.
Final bid value
29450 USD
Auctioned at
Auction
iaai
Sale method
auction
Sale status
Not available
Lot number
36901819
VIN
WBS33AY08MFL25523
Body color
Unknown
Transmission
Unknown
Drive
Unknown
Fuel
Unknown
Primary damage
Unknown
Secondary damage
Unknown
Odometer
10640 mi (Actual)
Retail value
35%
Estimated retail cost
Unknown
Location
Los Angeles, CA
Keys
Unknown
Documents
Unknown